TMR Mixer Maintenance Record
A TMR mixer is a heavy machine with exposed augers, knives and drivelines. This record tracks service by hours, wear checks and cost, and puts lockout and guarding first, so repairs are planned instead of a breakdown in the middle of feeding.
Updated 2026-11-22 · Mixers, Bunks and Equipment
Why it matters
Dull knives lengthen mixing time and leave long forage strands, loose bolts and worn chains fail without warning, and an unguarded driveline is a serious injury risk. Service items and intervals come from the maker manual. Safe practice follows OSHA and the operator manual.
Step by step
- List each service item from the operator manual with its interval in hours, such as gearbox oil, chain tension, greasing points and knife checks.
- Before any inspection or repair, shut off the machine, remove the key, disconnect power or the PTO, and apply lockout per your written procedure and OSHA rules.
- Log mixer hours at the start of each week, then compute hours since last service and hours remaining for each item.
- Inspect knives, auger flighting, floor and sidewalls for wear, and measure or photograph knife edges to compare season to season.
- Check guards, shields, the driveline and emergency stops, and do not run the mixer until every guard is back in place.
- Record parts and labor cost for each service, then divide yearly cost by tons mixed to track cost per ton.
Worked example
Illustrative: A gearbox service is due every 500 hours and the last was at 1,280 hours. The meter reads 1,600, so 320 hours are used and 500 - 320 = 180 remain. The mixer runs about 3.5 hours a day, 30 days a month, or 105 hours a month, so service is due in 180 / 105 = 1.7 months. If yearly repairs cost $1,800 and the mixer handled 1,200 tons, cost is 1,800 / 1,200 = $1.50 per ton.
Printable worksheet: mixer service record
- Mixer make, model and serial number: ______________
- Service item and maker interval: ____________ / ______ hours
- Hours at last service ______; hours now ______; hours remaining = interval - (now - last): ______
- Lockout done and key removed before work (initials): ______
- Knife condition and auger wear noted: ______________
- Guards and shields in place after service: yes / no
- Yearly repair cost ______ / tons mixed ______ = cost per ton: ______
Common mistakes
- Working on a knife or auger with the engine off but the driveline still connected, which can let the mixer turn during service.
- Replacing knives only after mix quality drops, when dull edges have already been wasting fuel and mixing time.
- Recording hours from memory instead of reading the meter, so intervals drift and services are missed.
Frequently asked questions
How do I know when knives need replacing?
Use the maker guidance and watch for longer mixing time, long forage strands in the bunk and visibly rounded edges. Compare edge condition with photos from earlier seasons, and replace as a full set so the load stays balanced.
Do I need a written lockout procedure?
Safe practice calls for one, and OSHA rules may apply to employees on your operation. Ask OSHA, your insurer or Cooperative Extension for requirements, and have each worker walk through the steps before touching the mixer.
Official sources
General education, not a diet or treatment plan. Confirm rations and medicated feeds with a qualified nutritionist, veterinarian or your Cooperative Extension office. Find extension nutritionists, feed regulators, testing labs and feed suppliers in your state.